PPE 113 WALL โ BAY SIDE (FE CABINET WALL) ยท THE BAY FACE OF THE WALL BETWEEN VEHICLE BAY 111 AND PPE 113 / DECON 114
SHEET A101 ยท THE DECON DOOR + THE SAFEAIR EXHAUST PANEL WALL ยท THE BAY FIRE-EXTINGUISHER CABINET CUTS INTO THIS WALL
โ ๏ธ X-RAY IS DRAWN FROM THE PLANS + PHOTOS. SCAN AND VERIFY IN THE FIELD BEFORE ANY CUT โ THE WALL-CUT RULE.
PLAN VIEW โ WHERE THIS WALL SITS
PLAN STRIP DRAWN FROM A101 โ SCHEMATIC, NOT A PLAN SHEET. THE WALL RUNS ALONG THE SOUTH SIDE OF VEHICLE BAY 111: MECHANICAL 120, DECON 114 AND PPE 113 OPEN OFF IT. STANDING IN THE BAY LOOKING AT THIS WALL, YOU FACE SOUTH โ PLAN-EAST (PPE SIDE) READS ON YOUR LEFT, PLAN-WEST (MECH SIDE) ON YOUR RIGHT. THE PHOTO UNDER IT WAS TAKEN FROM THE BAY SIDE, LOOKING SOUTH.
BAY SIDE โ ART'S PHOTO, NOV 11, 2026, TAKEN INSIDE THE BAY LOOKING SOUTH. THE DOOR IS DOOR 114 INTO DECON 114 โ THE ROOM BEHIND IT SHOWS ITS FLOOR DRAIN AND SHELF. RIGHT OF THE DOOR (PLAN-WEST): A SMALL WHITE SENSOR HIGH BESIDE THE DOOR HEAD, THEN THE SAFEAIR VEHICLE-EXHAUST CONTROL PANEL WITH ITS CONDUIT DROPS. LEFT OF THE DOOR (PLAN-EAST) IS THE PPE 113 STRETCH โ THE FIRE-EXTINGUISHER CABINET GOES THERE (PLOTTED ON THE WALL BELOW; IT IS NOT CUT IN YET, SO THE PHOTO SHOWS PLAIN WALL). THE PHOTO WAS CLEANED ON ART'S ORDER โ THE STAGED GEAR AND THE MAN IN THE DOORWAY WERE ERASED; THE WALL, DOOR, SENSOR AND PANEL ARE AS PHOTOGRAPHED. THE FRAME COVERS THE FLOOR TO ABOUT EL. 11′-10″ โ THE WALL RUNS ON UP TO THE 14′-0″ TRUSS BEARING, AND NOTHING ABOVE THE PHOTO IS ON THIS PAGE.
NO PHOTO OF THIS WALL FROM INSIDE DECON 114 OR PPE 113 IS IN THE RECORD โ SO IT IS NOT SHOWN HERE. (EVIDENCE RULE: IF IT HASN'T BEEN SEEN, IT DOESN'T GO ON HERE.)
THE WALL FACE โ THE CABINET PLOT + WHAT'S ON THE WALL
THE FACE IS ART'S PHOTO AT ITS TRUE PROPORTIONS โ NOTHING STRETCHED. THE CABINET OUTLINE IS THE PLAN'S (A101), DRAWN OVER THE FACE AT ITS PLAN SPOT AND ITS TRUE CUT SIZE. DRAG THE YELLOW OPENING AROUND THE FACE AND READ THE VERDICT. STATIONS READ FROM DOOR 114'S CENTER; HEIGHTS READ OFF THE FLOOR.
BAY FACE โ AS YOU SEE IT STANDING IN THE BAY
CARA DEL LADO DE LA BAHรA โ COMO SE VE ESTANDO DENTRO DE LA BAHรA
OPENING:
DRAG THE OPENING ON THE WALL โ THE VERDICT READS WHAT'S IN THE CUT.
CENTER
โ
BOTTOM EDGE
โ
TOP EDGE
โ
EVIDENCE NOTES โ WHERE EVERY LINE CAME FROM
WHICH WALL THIS IS โ ART, NOV 11, 2026, ON THIS PHOTO: “THAT'S WHERE THE OTHER FIRE EXTINGUISHER GOES.” THE BAY-SIDE FACE OF THE PPE 113 / DECON 114 WALL โ THE WALL THE BAY FIRE-EXTINGUISHER CABINET CUTS INTO.
๐ฅ THE CABINET โ SHEET A101: A101 DRAWS THE “FE” SYMBOL ON THE BAY FACE OF THIS WALL, OVER PPE 113, JUST EAST OF THE DECON / PPE PARTITION โ MEASURED OFF THE SHEET AT ABOUT 3′-6″ EAST OF DOOR 114'S EAST JAMB (PLAN SCALE READ OFF THE 3′-0″ DOOR, A601). THE PLOT ON THE FACE SITS AT THAT SPOT โ STATION APPROXIMATE, VERIFY IN THE FIELD BEFORE LAYOUT.
THE CABINET IS SEMI-RECESSED โ RFI #46'S RESPONSE (ESSE, NOV 10, 2026): INSTALL THE TWO CABINETS SHOWN ON A101; NO CABINET AT DOOR 111; THE BAY CABINET GOES SEMI-RECESSED IN THE PPE 113 WALL. ROUGH CUT PER ART'S VERIFIED NUMBERS FOR THE APPROVED CABINET: 3″ DEEP ร 25″ HIGH ร 10¾″ WIDE (LARSEN'S 2409-R3 SEMI-RECESSED). TOP OF CABINET 54″ AFF PER SPEC 10 4415 โ SO THE PLOT RUNS 29″ TO 54″ AFF AT ITS TRUE 10¾″ WIDTH.
โ ๏ธ MODEL CONFLICT โ DO NOT CUT FROM EITHER NUMBER UNTIL IT IS RESOLVED: THE APPROVED-SUBMITTAL SUMMARIES NAME LARSEN'S SS2409-6R (FULL-DEPTH BOX), WHILE THE TCC THREAD AND ART'S VERIFIED ROUGH OPENING (25″ H ร 10¾″ W ร 3″ D) MATCH THE 2409-R3 SEMI-RECESSED. THE PLOT USES ART'S VERIFIED NUMBERS. THE CONFLICT RIDES RFI #47.
โ NO CUT โ RFI #47 IS OPEN: RFI #47 (AT ESSE, DUE NOV 13, 2026) ASKS THE STRUCTURAL ENGINEER WHAT MAY BE CUT FOR THIS CABINET โ WHICH REINFORCEMENT, WHAT FRAMING, HEADER, JAMB, BLOCKING, GROUT OR REPAIR THE RECESS NEEDS, OR A REVISED LOCATION. THIS WALL IS FULLY GROUTED, REINFORCED CMU. UNTIL THE STRUCTURAL ANSWER LANDS, THE CABINET SPOT IS A NO-CUT.
REBAR โ NOT PLOTTED ON THIS WALL: NO WALL-SPECIFIC ELEVATION FOR THIS WALL WAS DERIVED FROM THE GOVERNING SHOPS (SUBMITTAL #03 200-1 REV 0) FOR THIS PAGE โ THE SHOP ELEVATIONS EXTRACTED TO DATE COVER THE EXTERIOR AND GABLE WALLS. SO NO BAR POSITIONS ARE DRAWN AND NO “CLEAR” STEEL VERDICT IS GIVEN HERE. THE WALL IS FULLY GROUTED, REINFORCED CMU โ EXPECT STEEL IN THE CUT ANYWHERE, AND LET THE SCAN + RFI #47'S ANSWER GOVERN.
THE SAFEAIR PANEL โ FIELD TRUTH (ART'S PHOTO, NOV 11, 2026): THE VEHICLE-EXHAUST CONTROL PANEL IS MOUNTED ON THIS FACE WEST OF DOOR 114, WITH FOUR CONDUIT DROPS ENTERING ITS TOP. A101 KEYNOTE 21 TAGS A CONTROLS PANEL ON THIS WALL (SEE ELECTRICAL DRAWINGS). WHAT RUNS IN THE WALL BEHIND AND ABOVE THE PANEL HAS NOT BEEN SEEN โ THE SCAN FINDS IT.
THE SMALL WHITE SENSOR HIGH BESIDE DOOR 114'S HEAD (PHOTO) โ A DEVICE ON THE FACE MEANS A BOX AND WIRING IN THE WALL BEHIND IT; ITS RUN HAS NOT BEEN SEEN.
DOOR 114 โ DECON 114: 7′-0″ HIGH ร 3′-0″ WIDE, HM / PAINT (A601 DOOR SCHEDULE), HINGED AT THE PARTITION (EAST) JAMB, SWINGING INTO DECON. THE ROOM BEHIND IT SHOWS ITS FLOOR DRAIN AND A SHELF (PHOTO; A101 KEYNOTE 12 โ FLOOR DRAIN, SEE PLUMBING).
ORIENTATION: THIS PAGE IS THE BAY FACE โ AS YOU SEE IT STANDING IN THE BAY LOOKING SOUTH. PLAN-EAST (PPE 113 SIDE) READS ON THE PHOTO'S LEFT; PLAN-WEST (MECHANICAL 120 SIDE) ON ITS RIGHT โ WHICH IS WHY THE CABINET, EAST OF THE DECON DOOR ON THE PLAN, PLOTS LEFT OF THE DOOR ON THE FACE.
THE PHOTO ITSELF: ART'S NOV 11, 2026 FIELD PHOTO, CLEANED THE SAME DAY ON HIS ORDER (STAGED GEAR + THE MAN IN THE DOORWAY ERASED). THE CLEANED FACE IS WHAT THIS PAGE CARRIES; THE ORIGINAL STAYS IN THE JOB RECORD. THE PHOTO'S OWN SCALE CHECKS TRUE: THE DOOR FRAME MEASURES THE SAME INCHES-PER-PIXEL SIDEWAYS AS UP-AND-DOWN (WITHIN 1%), SO THE PLOT IS NOT DISTORTED.
SOURCES: A101 (FE SYMBOL + KEYNOTES 12 / 21) ยท A601 DOOR SCHEDULE (DOOR 114 โ 7′-0″ ร 3′-0″ HM) ยท SPEC 10 4415 (TOP OF CABINET 54″ AFF) ยท RFI #46 + ITS RESPONSE (ESSE, NOV 10, 2026) ยท RFI #47 (OPEN AT ESSE, DUE NOV 13, 2026) ยท SUBMITTAL #03 200-1 REV 0 (CFSS โ NO ELEVATION FOR THIS WALL DERIVED) ยท ART'S PHOTO, NOV 11, 2026 (CLEANED) ยท ART'S IDENTIFICATION OF THE WALL, NOV 11, 2026.