No photo stretched under this one ā the whole wall is built on the plan: the full 7ā²-8ā³ run, face to face ā grid C to grid D measures 8ā²-8ā³ on A102. Steel comes off the structural set. A service is drawn only where a photo or a plan actually shows it ā if it hasn't been seen, it isn't on here, and the bottom notes name what's known but not plotted. The scan still runs before any cut.
Wall X-Ray Ā· the wall between PPE 113 and Decon 114 ā 8ā³ CMU, 7ā²-8ā³ long face to face (8ā²-8ā³ grid C to grid D), 14ā²-0ā³ tall. The plan puts the whole wall in front of you; drag the 12ā³Ć12ā³ opening along it and it tells you what you would hit.
The whole wall on the plan ā tap a room to see that face's photo
The two faces ā Art's photos, Oct 27
PPE ROOM SIDE. Painted block, floor to the 9ā²-6ā³ ceiling. The control-joint groove runs floor to ceiling at mid-wall (your phone saved this picture sideways ā it's shown turned right). Seen on this face: a device with a blue plate ā1ā²-3ā³ off the floor on the photo-left half, a blank device outline ā1ā²-3ā³ near the photo-right end, boxes resting at the floor. The storefront past the photo-right corner is the next wall over ā not this wall.
BACK OF PPE ROOM ā the Decon side. The control-joint groove stands vertical at mid-wall here too. Open ceiling: a domestic cold water pipe + ducts run above the ceiling line ā in the plenum in front of the wall, not in the wall. This photo starts at ā2ā²-3ā³ off the floor (the floor is out of frame) and runs to ā11ā²-0ā³.
The wall, built ā drag the opening
ā¦
CL from control joint
ā
CL height
ā
Top of opening
ā
From photo-left end
ā
Layers ā tap to show / hide
HOW THIS ONE IS BUILT: the base is the plan ā A101/A111 ā with the whole wall run in context (Decon 114 on one face, PPE 113 on the other; bay-side wall at grid C on one end, exterior wall at grid D on the other). The wall below the plan is that same run stood up: block courses at 8ā³, the control joint drawn as a joint line at mid-length with the solid poured cells beside it in light shade only, steel off S101/S102/S103/S201/S303. The wall build's left/right follows the PPE photo (photo-left / photo-right) ā which photo end is the bay side isn't confirmed, and it doesn't change a verdict: the steel pattern is symmetric about the joint.
WHAT'S VERIFIED FOR THIS WALL (plans): S101 puts a masonry control joint (WCJ) at the mid-length of this wall ā and the groove is visible on both faces in Art's Oct 27 photos. Per 4/S303 the first cell each side of the joint holds a vertical #5 and is grouted solid (CJ ±8ā³). Per S102/S103 Note 1, #5 verticals @ 24ā³ o.c. full height, with bars at the wall ends ā so bars sit at ±2ā² and at the wall ends, measured from the joint (the 7ā²-8ā³ run is too short for a ±4ā² bar). Top of wall: bond beam 12ā²-8ā³ to 14ā²-0ā³, (2) #5 (S201). A101 draws no door in this wall and no fixtures on either face ā Decon's shower unit is on Decon's Mech-side wall; Decon's and PPE's doors are in the bay-side wall beside this one. Ceilings: 9ā²-6ā³ both rooms (A111 ā field-confirmed by Art, Oct 27).
SEEN ā AND DRAWN WHERE IT WAS SEEN: PPE face ā the blue-plate device and the blank device outline, both ā1ā²-3ā³ AFF (photo). Decon side ā domestic cold water pipe + ducts above the ceiling (photo) ā plenum, not in the wall, drawn above the ceiling line. At the grid D corner ā two gray EMT stubs in the exterior wall right at this wall's junction (steel-era photo, foundation-rebar ev-09) ā marked on the plan above, at the corner where they were seen. On the plans ā E101 puts receptacles on this wall: both faces at the bay (grid C) end and one on the PPE face near the joint; they're drawn at their plan spots (symbol positions, approximate) because a device on the face means a box in the wall. On the plans ā P201 / P200 / E201 show crossings IN this wall: 1ā³ cold + 1ā³ hot mains at the north end and a ½Ⳡhot at mid-plan (P201), a 1½Ⳡvent in the south half and MS-1/FS-1 back-to-back at the south end (P200), a GFI receptacle on the Decon face ā40% from the north end (E201) ā and M200/M201 show the 12ā³Ć12ā³ exhaust trunk crossing above the ceiling at the south end. The in-wall crossings are plotted on the wall below as PLAN-SHOWN station bands; no height is dimensioned for any of them, so no height is drawn.
IN THIS WALL ā NAMED BY ART, NOT PLOTTED:COPPER pipe and CONDUIT (pipes for wires) are in this wall ā Art's word, Oct 27. No photo and no plan pins their runs inside this wall, so the runs are not drawn. They are exactly what the pre-cut scan is for, and every CLEAR verdict on this page says so. What the plans DO pin is plotted: P201 crosses this wall with the 1ā³ cold + 1ā³ hot copper pair at the north end and a ½Ⳡhot at mid-plan (valve CBV 1GPM) ā station only, no height dimensioned. (The pair of blue lines in the Mech-room photos is the air-conditioning control conduit on the Mech/Decon wall ā E001 legend, Art's ID. Not this wall.)
NOT PLACED ā NOT SEEN: no in-wall sprinkler is placed in this wall ā FP200 shows no sprinkler pipe in or crossing this wall (a sprinkler pipe is confirmed through the Mech/Decon wall only ā Art). No crossing is given a height ā the plans dimension none, so the plotted crossings run as station bands, not lines at a made-up height. No conduit run is drawn behind the two PPE-face devices ā the devices are seen; what's behind them in the wall hasn't been. If it hasn't been seen, it doesn't go on here.
ā ļø X-RAY IS DRAWN FROM THE PLANS + PHOTOS. SCAN AND VERIFY IN THE FIELD BEFORE ANY CUT ā THE WALL-CUT RULE.