Add and subtract — pick fractions or decimals.
Slab: length × width × thickness.
Bank yards in the ground → loose yards on the truck → compacted yards in the fill.
Wall square footage → material count.
Drop and run → slope.
Slope and run → drop needed.
Percent ↔ inches per foot.
Lineal feet × bar size → pounds and tons.
Walls + ceiling → sheets, screws, mud.
~350 SF per gallon per coat on smooth drywall.
Common rafter, ridge in the center. Give the pitch off the plan — or the total rise.
Figured from the outside face of the sheathing: the seat cut covers the plate plus the plywood, and half the ridge thickness comes off at the center. The drawing is a layout map — not to scale.
Rise and run, figured to code — the count is worked so every riser lands legal.
Every riser in the flight comes out the same height — code allows at most 3/8" difference between the tallest and shortest riser in a flight.
Tape inches → decimal feet ("points").
Add the two columns: 4" + 8/16 = .33 + .04 = .38 ft.
Feet-inch-fraction calculator. Small words under a key are its CONV partner — tap CONV first.