← Job Brain

DIRT MODEL

—
The ground as it was, the dirt work, then the building going up — layer by layer, in the order it gets built.

BUILD IT IN ORDER

Flip a switch to show or hide that part of the work in the model above. Play runs the whole sequence in order. A dashed switch means that step is not in this view yet.

ABOUT THIS MODEL

Dirt Model is how the job BUILDS, in sequence. The Site Layout / Staging Board is where things SIT. Different tools.